PyPSA-China: An Open Optimization Model of the Chinese Energy System
PyPSA-China is an open-source capacity expansion and operational optimization model for the Chinese energy system, built on the PyPSA framework. It covers electricity, heating, gas, and hydrogen carriers at provincial resolution and features a dedicated module for modeling aluminum smelter flexibility as a demand-side resource in high-renewable grids.
Motivation
China's power system is undergoing a rapid transition toward variable renewable energy (VRE). At the same time, the country operates roughly 45 Mt of primary aluminum smelting capacity — one of the single largest electricity loads in any national grid. PyPSA-China brings these two dimensions together: it co-optimizes generation, storage, and transmission investment alongside aluminum smelter scheduling, showing how industrial overcapacity can provide seasonal flexibility and significantly reduce system costs.
Key Features
- Multi-sector energy system: integrated modeling of electricity, centralized/decentralized heating, gas, coal, and hydrogen.
- Provincial resolution: 30-province transmission network with inter-provincial transfer capacities.
- Myopic capacity expansion: sequential planning across multiple horizons (e.g., 2020 → 2030 → 2040 → 2050), carrying forward brownfield capacity.
- Aluminum smelter integration: potline-level unit-commitment sub-problem solved iteratively against the main dispatch/investment problem via nodal-price decomposition.
- Three-dimensional scenario framework: smelter flexibility × primary demand × grid-interaction market opportunity, each at low / mid / high levels (27 combinations).
- Configurable capacity ratios: aluminum smelter capacity can be scaled from 5 % to 100 % of the installed base to explore overcapacity effects.
- HPC support: automated SLURM job generation for large-scale scenario sweeps across 1 000+ configurations.
Workflow
The Snakemake pipeline proceeds in five stages:
prepare_base_networks_2020 (base-year network with existing infrastructure)
│
▼
prepare_base_networks (future-year networks with updated costs and potentials)
│
▼
add_existing_baseyear (attach existing generators, storage, transmission for 2020)
│
▼
add_brownfield (carry forward solved capacity from previous horizon)
│
▼
solve_network_myopic (optimize dispatch + investment; aluminum iterative loop)
Each stage reads from config.yaml and data files under data/, and writes intermediate or final networks to results/.
Heat-only workflow note (deprecated)
Older versions of this repo included an experimental heat-only workflow that relied on exogenous electricity prices. That approach is deprecated in this repo; electricity price analysis should use post-processing based on solved networks (see scripts/reconstruct_market_prices.py).
Synchronous-generation floor and mapped-price sidecar
The planning solve (scripts/solve_network_myopic.py) and the fixed-capacity dispatch solve
(scripts/run_dispatch_segmented_prices.py) can enforce a provincial synchronous-generation floor.
With the current default configuration, coal, nuclear, gas, and biomass synchronous generators must
produce at least 10 % of the local AC electricity load in each province and snapshot:
synchronous_generation_floor:
enabled: true
ratio: 0.10
The dispatch price export still writes the primary CSV from solved marginal prices
(buses_t.marginal_price). In addition, scripts/export_reconstructed_prices.py writes a
*_mapped.csv sidecar used by solar value-factor analysis. The mapped sidecar is reconstructed in
this order:
- Build a local mapped price from thermal/synchronous output and the fuel-based supply curve.
The biweekly normalization denominator is:
max(biweekly_max_thermal_output, biweekly_min_thermal_output / lr_threshold_first). With the defaultlr_threshold_first: 0.4, a stable must-run floor maps to the first supply band instead of being normalized to the peak band. - Apply the local must-run floor price rule:
- at or near
10 %of local AC load, treat synchronous output as must-run rather than marginal; - within
1.5 xthe floor (15 %of local AC load by default), keep the mapped sidecar price at0and protect it from later coal-price floors.
- at or near
- Do not apply a separate cross-province transmission price adjustment. Each province keeps its own mapped price based on local synchronous/thermal output; transmission effects are already reflected in the solved dispatch and marginal-price output.
Related configuration lives under dispatch_segmented_prices.price_export:
dispatch_segmented_prices:
price_export:
week_freq: "2W-SUN"
thermal_load_floor:
enabled: true
ratio: 0.10
mapped_supply_curve:
lr_threshold_first: 0.4
Installation
Prerequisites
- Python 3.9+ (see
envs/environment.yaml) - Gurobi Optimizer with a valid license (required to reproduce all scenarios in the paper)
- Sufficient memory (20–100 GB depending on network size)
Environment Setup
git clone https://github.com/your-repo/PyPSA-China.git
cd PyPSA-China
conda env create -f envs/environment.yaml
conda activate pypsa-china
Note:
- The Snakemake scripts in this repo are written against the project's original PyPSA stack (e.g. PyPSA ~0.29). If you create an environment with a much newer PyPSA, you may hit import errors such as
ImportError: cannot import name 'Dict' from pypsa.descriptorsinscripts/_helpers.py.
Solver and Licensing
- Default solver: Gurobi (
solving.solver.name: gurobiinconfig.yaml). - Academic license: Gurobi offers free academic licenses; see the Academic Program and Licenses page on the Gurobi website for activation instructions.
- Alternative solvers: other MILP solvers supported by PyPSA/linopy (e.g., HiGHS, CPLEX) can in principle be used by changing
solving.solver.nameand the correspondingsolver_options. Large-scale runs may be slower or fail to converge, so Gurobi is recommended for exact reproduction of published results.
Quick Start
-
Edit
config.yaml— set planning horizons, scenario parameters, and solver options. -
Run the full pipeline:
snakemake -j 1 solve_all_networks
- Generate summaries and plots:
snakemake -j 1 plot_all
Heat demand input (replace with your model output)
The heating demand time series used for the heating-sector coupling is read from the HDF5 file configured in the workflow (by default the heat-demand input includes e.g. data/heating/heat_demand_profile_positive_2030.h5).
The code expects a HDF5 key:
- Preferred:
/heat_demand_profiles - Fallback: if the preferred key is missing, the first key found in the file is used (and a warning is logged).
The dataset should be a table shaped like:
- index: timestamps aligned to
network.snapshots(resolution controlled byconfig.yaml: freq, e.g.6h) - columns: provinces (
pro_names) - values: heat demand as power (MW_th) used as
Load.p_seton"<province> central heat"and"<province> decentral heat".
Building thermal inertia (demand-side heat storage)
Optional demand-side building inertia can be enabled by adding heat-storage Stores on both central and decentral heat buses.
- Parameter template:
data/heating/building_inertia_template.csv(single file with separate central/decentral columns) - Config switch in
config.yaml:
building_inertia:
enabled: true
params_csv: "data/heating/building_inertia_template.csv"
carrier: "building thermal mass"
The CSV schema (columns):
provinceC_th_MWh_per_K_central,deltaT_K_central,standing_loss_per_hour_centralC_th_MWh_per_K_decentral,deltaT_K_decentral,standing_loss_per_hour_decentral
Effective storage energy is computed as: e\_nom = C\_{th}\,[\mathrm{MWh/K}] \times \Delta T\,[\mathrm{K}].
Exogenous electricity prices at coarse time resolution (e.g. 6h)
When config.yaml: freq is coarser than 1 hour (e.g. 6h, so 1460 snapshots), but the price CSV is hourly (e.g. hour=1..8760), the price loader will automatically aggregate hourly prices into slot blocks (default: mean) to match the network snapshots.
Running with Aluminum Integration
Enable aluminum smelter co-optimization by setting the following in config.yaml:
add_aluminum: True
aluminum_commitment: False # keep False for iterative mode
aluminum_max_iterations: 10 # max power–aluminum iterations
aluminum_convergence_tolerance: 0.01
aluminum_capacity_ratio: 1.0 # 1.0 = 100 % of installed capacity
Then run the pipeline as above. The solver will automatically enter the iterative aluminum loop inside solve_network_myopic.
Running on HPC with SLURM
python scripts/generate_slurm_jobs_advanced.py # generate job files
./submit_multiple_jobs.sh # submit all scenarios
squeue -u $USER # monitor
See the SLURM Jobs Guide for details.
Configuration
All parameters live in config.yaml. Scenario-specific overrides are stored in configs/ (over 1 000 pre-generated files covering the full scenario matrix).
Core Switches
add_aluminum: True # enable aluminum module
aluminum_commitment: False # unit-commitment in main problem (keep False for iterative)
aluminum_max_iterations: 10
aluminum_convergence_tolerance: 0.01
aluminum_capacity_ratio: 1.0 # scale smelter capacity
Wind/Solar Capacity Guards (current default)
To prevent unrealistic VRE expansion in myopic planning, the model applies pre-solve national-to-provincial guards for wind and solar:
- Wind guard:
wind_capacity_guardinconfig.yaml, implemented inscripts/wind_capacity_guard.py - Solar guard:
solar_capacity_guardinconfig.yaml, implemented inscripts/solar_capacity_guard.py - Applied years:
2025to2060 - Band constraints: lower =
0.8 × target, upper =1.3 × target(allow_underbuild_only: false)
Target files:
- Wind (
onwind/offwind):data/p_nom/national_wind_capacity_from_planning.csv - Solar:
data/p_nom/national_solar_capacity_from_external_targets.csv
Solar target trajectory currently follows the CPIA 2026 outlook baseline path:
- 2026 additions range: 180–240 GW (baseline uses +180 GW)
- 2026–2030 average additions range: 238–287 GW/yr (baseline uses +238 GW/yr)
- Post-2030 planning years continue with +238 GW/yr unless replaced by newer official assumptions
These guards do not override physical provincial potential ceilings: p_nom_max potential limits from prepare_base_network remain active and still cap the final feasible upper bound.
Scenario Dimensions
aluminum:
current_scenario:
smelter_flexibility: "mid" # low / mid / high
primary_demand: "mid" # low / mid / high
scenario_dimensions:
smelter_flexibility:
low: { p_min_pu: 0.99, restart_cost: 96594, stand_by_cost: 1.2 }
mid: { p_min_pu: 0.9, restart_cost: 13981, stand_by_cost: 1.2 }
high: { p_min_pu: 0.7, restart_cost: 2796, stand_by_cost: 1.2 }
non_constrained: { p_min_pu: 0.0, restart_cost: 0, stand_by_cost: 0 }
Solver Settings
solving:
solver:
name: gurobi
solver_options:
default:
Threads: 192
Method: 2 # barrier
Project Structure
PyPSA-China/
├── config.yaml # main configuration
├── configs/ # 1 000+ scenario-specific configs
├── Snakefile # Snakemake workflow
├── data/
│ ├── aluminum_demand/ # demand scenarios (JSON)
│ ├── p_nom/ # smelter capacity by province (CSV)
│ ├── costs/ # technology cost projections
│ ├── grids/ # grid topology
│ ├── load/ # provincial load profiles
├── resources/ # renewable generation profiles
├── scripts/
│ ├── prepare_base_network*.py
│ ├── add_existing_baseyear.py
│ ├── add_brownfield.py
│ ├── solve_network_myopic.py
│ ├── scenario_utils.py
│ ├── plot_*.py
│ └── generate_slurm_jobs_advanced.py
├── docs/ # documentation (see below)
├── envs/ # conda environment files
├── results/ # output networks, summaries, plots
└── LICENSES/
Documentation
Detailed documentation is provided in the docs/ folder:
| Document | Description |
|---|---|
| Aluminum Integration Guide | End-to-end explanation of how aluminum demand data, smelter capacity, and model components (Link, Store, Load, Hub) are assembled, including unit-conversion formulas and the data-flow diagram. |
| Iterative Optimization Notes | Refactoring notes for the aluminum iterative algorithm: convergence criterion, network reload strategy, p_set fixing, virtual-generator marginal costs, and the potline-based representative-line method. |
| Flexible Aluminum Smelting Intro | Technical feasibility report on flexible aluminum smelting — EnPot/TRIMET evidence, historical curtailment events, the economic logic of seasonal batch operation, and potline-level modeling parameters for China. |
| Scenario Dimensions Guide | How to configure and use the three scenario dimensions (smelter flexibility, primary demand, grid-interaction market opportunity) and generate all 27 combinations. |
| Scenario Visualization Guide | Instructions for the maintained scenario post-processing scripts: value comparison, capacity/cost panels, and optimal-point plots. |
| SLURM Jobs Guide | Generating, submitting, monitoring, and troubleshooting SLURM batch jobs on HPC clusters. |
| Price Module Report | Notes on the two-stage dispatch price workflow, mapped-price sidecar, and solar value-factor dataset. |
| Solar Value Dataset Notes | How to fill and plot the 2025 solar value-factor dataset from dispatch price outputs. |
Iterative Aluminum Optimization Algorithm
The aluminum module uses a price-based decomposition loop:
- Relaxed solve: solve the full network with continuous (non-committable) aluminum links to obtain nodal marginal electricity prices.
- Aluminum sub-problem: for each province in parallel, build a small MILP with a single representative potline (250 kt/yr, ~385 MW) scaled to the provincial total, using the nodal price as the virtual-generator marginal cost. Solve for optimal commitment and dispatch.
- Fix and re-solve: write the resulting provincial aluminum time series back into the main network via
links_t.p_setandloads_t.p_set, then re-solve. - Convergence check: stop when the relative change in the system objective falls below the threshold (default 1 %).
This approach keeps the main problem as a tractable LP while capturing potline-level start-up/shut-down economics in the sub-problem.
Scenario Analysis and Visualization
After completing scenario runs, generate comparison figures with the maintained post-processing scripts:
# cost/value changes across demand × market × flexibility scenarios
python scripts/plot_value_scenario_comparison.py
# publication-style 2050 MMM capacity/cost panel
python scripts/plot_capacity_MMM_2050.py
# optimal capacity points across years and market/flexibility settings
python scripts/plot_optimal_point.py
Outputs are saved under the configured results/version-* directories and script-specific
analysis folders.
Output Files
Results are organized by version and scenario:
results/
└── version-<version>-<scenario>/
├── networks/ # intermediate .nc files
├── postnetworks/ # solved networks
└── summary/
└── postnetworks/
└── costs.csv, capacities.csv
Troubleshooting
| Problem | Suggestion |
|---|---|
| Solver license error | Verify Gurobi license with gurobi_cl --license |
| Out of memory | Increase --mem-per-cpu in SLURM or reduce network scope |
| Aluminum iteration does not converge | Raise aluminum_convergence_tolerance (e.g., 0.05) or increase aluminum_max_iterations |
| Missing data files | Check that all required CSVs and JSONs exist under data/ |
ImportError: cannot import name 'Dict' from pypsa.descriptors |
Use the project environment in envs/environment.yaml (PyPSA ~0.29) or update scripts/_helpers.py to match your PyPSA version. |
License
- Code: MIT License (
LICENSES/MIT.txt) - Data: CC0-1.0 (
LICENSES/CC0-1.0.txt) - Documentation: CC-BY-4.0 (
LICENSES/CC-BY-4.0.txt)
Citation
If you use PyPSA-China-aluminum in your research, please cite:
@article{lyu2025aluminum,
title = {Can industrial overcapacity enable seasonal flexibility in
electricity use? {A} case study of aluminum smelting in {China}},
author = {Lyu, Ruike and Jenkins, Jesse D. and others},
year = {2025},
journal = {arXiv preprint arXiv:2511.22839},
url = {https://arxiv.org/abs/2511.22839}
}
Contributing
Contributions are welcome. Please fork the repository, create a feature branch, and submit a pull request.
Acknowledgments
The codebase of PyPSA-China originates from the work of the 2022 PyPSA-China Authors and builds on the PyPSA framework. Technology cost data and learning trajectories in the core (Mid) scenario are adopted from the PyPSA-Eur technology database and the PyPSA-China-PIK dataset for China-specific costs, both primarily based on the Danish Energy Agency technology catalogues. Low and High cost cases for flexibility-related technologies are constructed by scaling investment costs by −20 % and +50 % relative to the Mid case, consistent with the accuracy ranges recommended for Class 4 estimates in the AACE International Cost Estimate Classification System (Bates, 2005).